dc.contributor.authorYilmaz, Tekin
dc.contributor.authorErcikdi, Bayram
dc.date.accessioned2022-02-16T12:29:37Z
dc.date.available2022-02-16T12:29:37Z
dc.date.issued2021en_US
dc.identifier.issn1735-1472
dc.identifier.issn1735-2630
dc.identifier.urihttps //doi.org/10.1007/s13762-021-03359-2
dc.identifier.urihttps://hdl.handle.net/20.500.12573/1152
dc.descriptionThe authors would like to express their sincere thanks and appreciation for the financial support to the Research Foundation of Karadeniz Technical University (Project No: FDK 2016-5500), to AGU Central Research Facility (AGU-CRF) for the analysis support and to Prof. Dr. Hac Deveci for improving paper quality.en_US
dc.description.abstractThe construction and demolition waste (CDW) could be used as backfill material to fill the voids created during the ore production in underground mining. However, there is a need to clarify the impact of CDW on groundwater pollution when it is used as backfill material in cemented paste backfill (CPB) of sulphide-rich tailings (S-rT). This study presents the influence of CDW on the long-term geo-environmental behaviour of CPB samples (CPBs) when used as replacement (10 wt.%) to S-rT. For this reason, the dynamic-tank leaching test was conducted on CPBs and pH, conductivity (Ec), sulphate (SO42-) and heavy metals (HMs) analyses were executed for leachates over 30-360 days of leaching period. The effects of mineralogy and microstructure on the geo-environmental behaviour of CPBs were also analysed via X-ray fluorescence (XRD) and mercury intrusion porosimeter (MIP). The utilisation of CDW in CPB mixtures was found to reduce the SO42- release (up to 13.89%), neutralise the acid generated and lower the Ec (up to 22.16%). Furthermore, the HMs releases (except As, Cu and Zn) were prevented (Ni and Cr) or reduced up to 92%, which is compatible with the improved CPB microstructure. Only the release of arsenic (As) exceeded the limit value for groundwater in CPB of CDW leachate. These findings suggest that not only the cost, strength and stability but also the impact on groundwater pollution should be considered when disposing of CDW as CPB material in underground voids.en_US
dc.description.sponsorshipResearch Foundation of Karadeniz Technical University FDK 2016-5500en_US
dc.language.isoengen_US
dc.publisherSPRINGERONE NEW YORK PLAZA, SUITE 4600 , NEW YORK, NY 10004, UNITED STATESen_US
dc.relation.isversionof10.1007/s13762-021-03359-2en_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectConstruction and demolition wasteen_US
dc.subjectGeo-environmental behaviouren_US
dc.subjectHeavy metalen_US
dc.subjectGroundwater qualityen_US
dc.subjectMicrostructureen_US
dc.subjectCemented paste backfillen_US
dc.titleEffect of construction and demolition waste on the long-term geo-environmental behaviour of cemented paste backfillen_US
dc.typearticleen_US
dc.contributor.departmentAGÜ, Mühendislik Fakültesi, Malzeme Bilimi ve Nanoteknoloji Mühendisliği Bölümüen_US
dc.contributor.authorID0000-0003-3288-5192en_US
dc.contributor.institutionauthorYilmaz, Tekin
dc.relation.journalINTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGYen_US
dc.relation.publicationcategoryMakale - Uluslararası - Editör Denetimli Dergien_US