Ara
Toplam kayıt 5, listelenen: 1-5
Implementation of cost benefit analysis of vehicle to grid coupled real Micro-Grid by considering battery energy wear: Practical study case
(SAGE PUBLICATIONS LTD, 1 OLIVERS YARD, 55 CITY ROAD, LONDON EC1Y 1SP, ENGLAND, 2020)
The proposed research represents a spin-off of the Malta College of Arts, Science and Technology (MCAST) Micro-Grid (MG) project. Particularly, economic impact of Electric Vehicles (EV) integration into the MG is investigated ...
Transformation of microgrid to virtual power plant - a comprehensive review
(INST ENGINEERING TECHNOLOGY-IET, MICHAEL FARADAY HOUSE SIX HILLS WAY STEVENAGE, HERTFORD SG1 2AY, ENGLAND, 2019)
To provide continuity of balancing demand and generation, renewable sources will be more active than today in near future due to the tendency of massive investment on renewable energy sources (RESs) by countries. However, ...
Implementation of capital deferral algorithm in real distribution systems considering reliability by managing major faults
(SPRINGER, ONE NEW YORK PLAZA, SUITE 4600, NEW YORK, NY, UNITED STATES, 2019)
Distribution automation technology plays a key role on power system reliability by providing faster detection, isolating the faulted area and restoring the fault. In this paper, the impacts of distribution automation are ...
Loss Calculation Technique With Randomize Load Curves
(GAZI UNIVCENTER CAMPUS TECHNOLOGY FAC B BLOCK EK BINA, 2ND FL, ANKARA, 06500, TURKEY, 2017)
Calculating feeder losses accurately is an important part of evaluating designs for electric power distribution systems. Historically, these losses have been calculated one of three ways: (1) using a peak load calculation ...
Investigation of distributed series reactors in power system applications and its economic implementation
(WILEY111 RIVER ST, HOBOKEN 07030-5774, NJ, 2017)
The transmission system expansion planning process requires lots of calculations looking many years into the future, and the results are based on assumed load growth. If the load growth assumed in the planning process is ...